Scoping tool

Clearance Envelope Worksheet

The frame is never the footprint. Doors swing, panels have to come off somewhere, maintenance needs room to stand, and the aisle behind it still has to work. This adds up the real space the installation consumes and tells you where it will clash — while that is still a drawing change rather than a site problem.

1. The structure

Wall to wall, or column to column — whatever actually bounds the area.

2. Doors

3. Service and removal

From the access matrix if you've built one.
Motors, gearboxes, tooling. If yes, the largest opening has to pass the largest item — this is the constraint most often discovered during the first breakdown.

4. Around it

Total envelope required

Does it fit?

Clearance budget

Limits

A planning worksheet for space allocation. Aisle widths, egress route requirements and clearances around fire protection equipment are set by building and fire codes and by your own site standards, which vary by jurisdiction and occupancy — the figures used here are common planning values, not code minimums. Confirm against the requirements applicable to your facility before finalising a layout.